Munchkin Gas-Fired Hot Water Boiler Manuale di Installazione Pagina 28

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 27
27
GAS-FIRED HEATER Installation Manual
Munchkin Contender Heater with optional VISION 1 system
(zoning with circulators)
Space heating mode
Drawing 3A
NOTES:
1. This drawing is meant to show system piping concept only.
Installer is responsible for all equipment & detailing required by local codes.
2. All closely spaced tees shall be within 4 pipe diameters center to center spacing.
3. A minimum of 6 pipe diameters of straight pipe shall be installed upstream & downstream of all closely spaced tees.
4. The minimum pipe size for connecting a Super Stor Ultra Indirect Water Heater is 1-inch.
5. The minimum pipe size for connecting the Munchkin Contender is 1.25-inch
6. Circulators are shown with isolation flanges and integral check valves. The alternative is standard flanges with full port ball valves and a
separate flow check valve. Purge valves can be used with the circulator flanges as an alternative.
7. Optional Vision 1 system includes temperature sensors for DHW and outdoor air and must be purchased separately.
8. The anti-scald mixing valve is recommended if the DHW temperature is set above the factory setting of 119˚F.
9. Install a minimum of 12 diameters of straight pipe upstream of all circulators.
DHW
temperature
sensor
closely spaced tees
purge
purge
purge
make-up water
zone
circulators
anti-scald mixing valve
thermal trap
(w/ drain plug)
P1
P2
OFF
outdoor
temperature
sensor
T/P
Munchkin
Contender
Heater
Super Stor Ultra
Indirect DHW Tank
(Vision 1 system)
(Vision 1 system)
high limit safety
see note 6
Vedere la pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 67 68

Commenti su questo manuale

Nessun commento